gprime.net boards

gprime.net boards (http://gprime.net/board/index.php)
-   works in progress (http://gprime.net/board/forumdisplay.php?f=10)
-   -   PFA Lined valves Inspection and Testing (http://gprime.net/board/showthread.php?t=16155)

haoyunjz 10-15-2013 06:14 AM

PFA Lined valves Inspection and Testing
 
Polymer batch numbers are linked to the manufacturers material certificate Discrete batches of polymer are not mixed. The bach number of the polymer used is recorded on the moulding log sheet against a specific mould reference. FPA lined valve testing, The PFA we use meets the requirements of ASTM D3307 Type 2. They are also specified as having a restricted melt flow index not exceeding 3 grammes in 10 miniutes. We extensively use our own in house melt flow indexing test equiment to ensure the PFA ball valve complies to our strict quality controls.


All times are GMT -5. The time now is 06:16 AM.

Powered by vBulletin® Version 3.7.2
Copyright ©2000 - 2018, Jelsoft Enterprises Ltd.
Copyright ©2005-2007 Gprime.Net